MinStrataAustralian exploration, geology & miningSearch

Yancoal pays US$1.85bn upfront for 80% of Kestrel coal mine, with up to US$550m tied to coking coal prices

Yancoal now holds 80% of Kestrel, an underground coking coal mine in Queensland's Bowen Basin. Its circular on the deal was lodged on 23 November.

A coal train at Kinrola Mine near Blackwater in Queensland's Bowen Basin, about 1971
Photo: Queensland State Archives via Flickr, Public Domain Mark 1.0 (cropped)
Four statistics. US$1.85 billion upfront cash paid at completion on 1 October 2026. Up to US$550 million contingent, payable over five years if the coking coal benchmark averages above US$225 a tonne. 164 million tonnes of Marketable Coal Reserves at 1 September 2025, 100% basis. 5.9 million tonnes of saleable coal produced in 2025, 100% basis.
MinStrata graphic; data: Source: Yancoal Australia market releases, 14 April and 1 October 2026 (reserves effective 1 Sep 2025, 100% basis)

Yancoal Australia Ltd (ASX: YAL) completed its acquisition of an 80% interest in the Kestrel coal mine in Queensland's Bowen Basin on 1 October 2026. It paid US$1.85 billion in cash upfront, before the usual completion adjustments. Mitsui Kestrel Coal Investment, a Mitsui company, keeps the other 20%.[1][2]

Kestrel is an operating underground longwall mine and mostly produces hard coking coal for steelmaking. Yancoal has counted its share of Kestrel's production, revenue and earnings since 1 October. On 23 November it lodged with the ASX the circular for its Hong Kong shareholders, which it had said would include accountants' reports, a competent person's report and a valuation report on the business it bought.[1][2][3]

Deal terms

Yancoal's acquisition of Kestrel Coal Group: terms as announced · US$ unless stated; terms at signing (14 April 2026) and completion (1 October 2026)[1][2]
Yancoal's acquisition of Kestrel Coal Group: terms as announced (US$ unless stated; terms at signing (14 April 2026) and completion (1 October 2026))
ItemDetail
Asset bought100% of Kestrel Coal Group Pty Ltd, which holds an 80% interest in the Kestrel joint venture through Kestrel Coal Resources Pty Ltd
SellersEMR Capital Advisors Pty Ltd, Kestrel Coal (EMR) Limited and Adaro Capital Limited (shares); Adaro Capital and EMR Capital Management Limited (warrants)
Upfront cashUS$1.85 billion, subject to completion adjustments, including deduction of the US$40 million deposit paid at signing
Contingent cashUp to US$550 million in total over the first five years: 30% of Yancoal's share of Kestrel revenue attributable to benchmark prices above US$225/t (nominal), measured annually
BenchmarkPlatts Premium Low Vol Hard Coking Coal FOB Australia (PLVHA00)
FundingAvailable cash plus an initial draw on a five-year US$1.2 billion syndicated acquisition loan; a five-year US$200 million working capital facility was undrawn at completion
Approvals requiredACCC, FIRB, Chinese outbound approvals (NDRC, Shandong commerce department, SAMR), offshore merger clearances, and Mitsui waiving its pre-emptive right
Shareholder approvalWritten approval from majority shareholder Yankuang Energy
Completed1 October 2026

Sources: Yancoal market release, 14 April 2026 (Appendix 1, key terms); Yancoal market release, 1 October 2026.

The contingent payment applies only when prices are high. Yancoal's own worked example assumes a US$250/t benchmark and an 85% price relativity for Kestrel's products. On those assumptions it would pay US$6.38 for each attributable tonne sold that year, which is (250 - 225) x 85% x 30%.[2]

To illustrate the scale, suppose attributable sales equalled 80% of Kestrel's 2025 saleable output, or 4.72Mt. On that example the payment would be about US$30 million in a year. This is our calculation, not company guidance, and actual payments depend on volumes, product mix and prices.[2]

Kestrel's reserves and resources

Kestrel Coal Resources and Marketable Coal Reserves by JORC category · Mt, 100% Kestrel basis; effective 1 September 2025[2]
Kestrel Coal Resources and Marketable Coal Reserves by JORC category (Mt, 100% Kestrel basis; effective 1 September 2025)
EstimateMeasured / ProvedIndicated / ProbableInferredTotal
Coal Resources (in situ, inclusive of reserves)10528120406
Marketable Coal Reserves58106n/a164

Resources are quoted as mineable tonnes in situ at 6.0% in-situ moisture. They include the coal converted to reserves and are not additional to them. Recoverable (run-of-mine) reserves are 216Mt. Resources Competent Person: Christopher Speedy, MAIG, RPGeo (Encompass Mining). Reserves: Geoffrey Watson, MAusIMM CP(Min), RPEQ (Kestrel Coal Resources). Yancoal reviewed the estimates as part of its due diligence but says it could not independently verify all the data. Source: Yancoal market release, 14 April 2026, Appendix 3.

Yancoal says the reserves support a 25-year mine life, subject to environmental approvals and mining licences. It says the life-of-mine plan contains no Inferred Resources. The mine has a 10.5Mtpa coal handling and preparation plant and a dedicated rail link to the RG Tanna Coal Terminal at Gladstone.[2]

Yancoal's figures are on a 100% basis. Its 80% attributable share of the 2025 saleable output would have been about 4.7Mt (our calculation). Yancoal estimated that the deal would raise metallurgical coal to 22% of its 2025 sales volumes on a pro forma basis.[2]

“The acquisition of an 80% interest in the Kestrel Coal Mine represents a strong strategic fit for Yancoal and adds a high-quality, long-life metallurgical coal asset to our portfolio.”

Sharif Burra, Chief Executive Officer, Yancoal Australia Ltd[1]

Balance sheet effect

At signing, Yancoal estimated pro forma leverage of 0.9x to 1.1x net debt to 2025 operating EBITDA, with gearing of about 15% to 18%, using 31 December 2025 accounts adjusted for the acquisition loans. Part of the acquisition loan is expected to be used after completion to repay debt that the Kestrel group already held.[1][2]

Yancoal's December 2026 quarterly report should be the first to include a full quarter of its attributable Kestrel output.[1]


Related coverage